Malockdredge Safety Limited - Precision in Execution
NB: The bore hole drilling operation is affected in stages viz:
STAGE 1: Geological Survey:
The initial step is to undertake a geological survey to determine the depth of the aquifer, good drinkable water and tong lasting one. This is the feasibility work which will reveal the water level and rock basement which will enable us achieve a perfect work.
STAGE 2: We drill between 35-100 meters depending on the geological survey report showing the water level and basement rock. The basement rock does not pose much challenge as we have the needed equipment to ensure success of the exercise.